Quick Answer: What Does Broward Require for the Electrical Side of Recertification?

Broward County no longer runs a "40-year" program. Under the Broward County Board of Rules and Appeals (BORA) Building Safety Inspection Program, covered buildings need a structural and electrical safety inspection once they reach 25 years from the certificate of occupancy, then every 10 years after that (BORA Policy #05-05). The electrical report must be completed by a qualified Florida-licensed professional specializing in electrical design, on BORA's own Electrical Safety Inspection Report form, with a written narrative and color photos. A scan by certified thermographers before the inspection finds loose connections and overloaded equipment that a visual inspection with the covers off can miss. It turns surprise deficiencies into planned repairs before the 180-day windows, gives the engineer documentation, and starts the annual record NFPA 70B expects.

Key Takeaways

  • Broward's program starts at 25 years (not 40) and repeats every 10 years, counted from the year the first inspection was required, not from when a report was filed.

  • Owners have 180 days from the Notice of Required Inspection to submit the report, and 180 days from the report date to complete required repairs.

  • The electrical report must come from a Florida-licensed professional specializing in electrical design, and anyone removing equipment covers must be trained to NFPA 70E and OSHA 1910 requirements.

  • A pre-inspection scan by certified thermographers finds loose connections and overloaded equipment that a visual inspection with the covers off can miss, turning surprise deficiencies into planned repairs before the 180-day windows.

  • In Broward, the Building Safety Inspection also counts as the state milestone inspection for qualifying condominium and cooperative buildings.

Main electrical room in an older South Florida building with switchgear and a thermal imaging camera on an inspection cart

Is Broward's Recertification Still a 40-Year Program?

No. Many owners, boards, and even vendors still call it "40-year recertification," but BORA Policy #05-05 (effective August 9, 2024) sets the first inspection when a building or structure reaches 25 years of age, based on the date the certificate of occupancy was issued. Subsequent inspections are due every ten years from the year the initial inspection was required, "regardless of when the previous inspection report for the building or structure was finalized or filed" (BORA Policy #05-05).

Buildings that completed an inspection under the prior "40 Year Building Safety Inspection Program" are deemed compliant, with their next inspection due ten years from the year the earlier inspection was required.

The program is established by Section 110.15 of the Broward County Administrative Provisions of the Florida Building Code and is enforced by each local building official. That is why your notice comes from your city, such as Fort Lauderdale, Hollywood, or Pompano Beach, even though the rules are countywide (City of Fort Lauderdale).

Which Broward Buildings Need a Building Safety Inspection?

Most commercial, multifamily, hospitality, healthcare, and mixed-use buildings in Broward are covered once they reach 25 years. Parking garages and guardrails are not exempt, and elevated decks, balconies, docks, and seawalls are included when they are attached to or support a structure.

BORA Policy #05-05 exempts:

  • U.S. Government and State of Florida buildings

  • Buildings on sovereign tribal lands

  • School buildings under the Broward County School Board

  • Single-family through four-family dwellings with three or fewer habitable stories above ground

  • Fee simple townhouses, as defined in the Florida Building Code

  • Minor structures under 3,500 square feet (unless they house equipment needed to operate the primary structure)

  • Railroads and associated facilities

What Does the Electrical Inspection Cover?

BORA's "General Considerations & Guidelines for Building Safety Inspections" set the minimum electrical scope (BORA Guidelines). The inspecting professional is expected to evaluate and document:

  • Electric service: service size in amperes, single- or three-phase, fuses or breakers, and proper grounding of the service.

  • Meter and electrical rooms: sufficient working clearance for both work and inspections; gutters and panels in good condition throughout the building.

  • Switchgear and branch circuits: all identified, with a visual inspection and evaluation of switchgear, conductors, and terminations.

  • Grounding of building equipment: including emergency generators, elevators, and motors.

  • Conduit and raceways: accessible conduit free of excessive corrosion and properly supported.

  • Fire alarm system: in good working condition with an up-to-date certification label.

  • Emergency and exit lighting: in good working condition.

This is a recommended minimum that does not replace professional judgment. The baseline is the code in effect when the building was built, so the inspection does not force older buildings up to the current code. Unpermitted work, however, must be identified and legalized before the report can be completed.

Who Can Perform the Electrical Inspection?

Under BORA Policy #05-05:

  • The Electrical Safety Inspection report must be completed by a qualified Florida-licensed professional specializing in electrical design (a Florida-licensed engineer or architect under Chapter 471 or 481, Florida Statutes).

  • Anyone removing electrical equipment covers to allow the inspection must be familiar with NFPA 70E and OSHA 1910 requirements, verified with a certificate of completion.

Opening energized equipment is exactly the exposure NFPA 70E and OSHA 29 CFR 1910 Subpart S address, so ask for proof of training before inspection day.

Why Scan with Infrared Before a Broward Electrical Inspection?

A visual inspection with the covers off catches corrosion, damage, and obvious overheating. It cannot see heat that has not yet discolored anything. Loose lugs, failing breakers, unbalanced loads, and overloaded conductors usually show up on an infrared camera long before they are visible.

A pre-inspection infrared survey by certified thermographers gives owners and boards three advantages:

  1. Fewer surprises in the report. Problems you find and fix before the inspection are problems you can plan and budget for, instead of deficiencies with a 180-day repair clock attached.

  2. Better evidence for the engineer. Thermal and visible-light images, with load conditions and equipment locations, support the color photos and narrative that BORA requires.

  3. A maintenance baseline. The same scan becomes the first entry in an ongoing electrical maintenance program, which is what NFPA 70B is built around.

BORA's electrical guidelines are based on a visual inspection of switchgear, conductors, and terminations; many owners add an infrared scan to see what a visual check can't. The inspecting professional can still use or recommend thermal imaging when conditions call for it, and BORA's report criteria require them to "identify and describe any items requiring further inspection." Always check the notice and forms from your own city's building department.

NFPA 70B is a standard with mandatory language. It is not automatically law, but it becomes enforceable when a jurisdiction, regulation, contract, or insurer adopts or requires it, and it is widely treated as the benchmark for reasonable electrical maintenance. Its thermography guidance calls for infrared inspections at least every 12 months, and every 6 months for equipment in poor condition. See how often you should perform infrared electrical inspections and what changed in NFPA 70B 2026.

What Are the Deadlines and Reporting Rules?

BORA Policy #05-05 sets the timeline:

  • Notices: By June each year, BORA gives local jurisdictions a list of buildings due. Fort Lauderdale, for example, mails notices by certified mail between June 1 and August 31. A missing notice does not excuse the owner from getting the inspection done on time.

  • Report: Within 180 days of the notice, submit the signed and sealed written report, including BORA's Structural and Electrical Safety Inspection report forms. Proprietary forms are not accepted. The building official may grant an extension of up to 60 days.

  • Repairs: Complete required repairs within 180 days of the report date unless the building official specifies otherwise, with permits. If repairs are needed, the inspecting professional must provide a signed and sealed letter stating whether the building can stay occupied during repairs, valid for up to 180 days.

  • Closeout: After repairs, the same professional re-inspects and issues an amended report and letter confirming the building is acceptable for continued use.

  • Duty to report: Findings that would endanger life or property must be reported to the owner, association, and building official. Conditions posing an immediate danger, including a fire hazard, must be reported to the building official within 24 hours.

Missed deadlines can go to a special magistrate or code enforcement board.

How Does This Fit with Florida's Milestone Inspection Law?

Florida's milestone inspection law, Section 553.899, Florida Statutes, requires structural milestone inspections for condominium and cooperative buildings three or more habitable stories tall, by December 31 of the year the building turns 30 (or 25 where the local enforcement agency requires it), and every 10 years after. The state law is structural only.

BORA Policy #05-05 states that Broward's Building Safety Inspection serves as compliance for both phase one and phase two milestone inspections. So a Broward condominium does one program that covers both, and that program includes electrical. Condominium and cooperative associations must also distribute the inspector-prepared summary to unit owners, post it on the property, and publish it on the association website if they are required to have one. For background, see our post on Florida SB 4-D and building recertification.

How Should Owners and Boards Prepare for the Electrical Inspection?

  • Find your date. Confirm the certificate of occupancy date and when your last inspection was required, not just when it was filed.

  • Pull records. Permits, prior inspection reports, one-line diagrams, and any open code cases with the city.

  • Clear electrical and meter rooms. Storage in front of panels is one of the most common findings.

  • Check fire alarm and emergency lighting. Confirm current certification labels and working exit and emergency lights.

  • Schedule an infrared scan first. Have certified thermographers survey switchgear, panelboards, disconnects, transfer switches, and transformers under normal load a few weeks before the engineer's visit.

  • Look at arc flash labels. If equipment is unlabeled or labels are outdated, an arc flash study is a good companion project.

Frequently Asked Questions

Is Broward County recertification required at 40 years or 25 years?

At 25 years. BORA Policy #05-05 requires the first Building Safety Inspection when a building reaches 25 years from its certificate of occupancy, then every 10 years. "40-year recertification" is the old program name.

Should I get an infrared scan before my Broward recertification?

Yes. A scan by certified thermographers before the inspection can find loose connections and overloaded equipment that a visual inspection with the covers off can miss. That turns surprise deficiencies into planned repairs before the 180-day windows, gives the engineer documentation, and starts the annual record NFPA 70B expects. BORA's electrical guidelines focus on a visual inspection; many owners add an infrared scan to see what a visual check can't.

Who can sign the Broward electrical safety inspection report?

A qualified Florida-licensed professional specializing in electrical design. The report must be signed and sealed, use BORA's Electrical Safety Inspection Report form, and include a narrative and color photos.

How long do I have to complete repairs after the inspection?

180 days from the date of the inspection report, unless the building official specifies otherwise. Extensions may be possible when the licensed professional sets a timeframe the building official approves and an active permit is kept.

Does Broward's program satisfy Florida's condo milestone inspection?

Yes. BORA Policy #05-05 states that the Building Safety Inspection serves as compliance for both phase one and phase two milestone inspections under Section 553.899, Florida Statutes.

Is NFPA 70B legally required in Broward County?

Not automatically. NFPA 70B is a standard with mandatory language that becomes enforceable when a jurisdiction, regulation, contract, or insurer adopts or requires it. BORA's program does not cite it, but it is the recognized benchmark for electrical maintenance between recertification cycles.

Get Ahead of Your Broward Building Safety Inspection

Assured NDT provides infrared thermography inspections by certified thermographers for condominiums, commercial buildings, hotels, and healthcare facilities across Broward, Palm Beach, and Miami-Dade counties. We document findings so your engineer of record and maintenance team can act on them. Learn more in our NFPA 70B compliance white paper, or contact Assured NDT to schedule a pre-inspection scan.

Standards and Sources Referenced

This article is for general information and is not legal or engineering advice. Confirm the requirements that apply to your building with your local building official and a qualified Florida-licensed professional.

About the Author

Stephen Fike is the Principal of Assured NDT and Risk Assured, where he leads a team specializing in risk engineering, fire protection, and non-destructive testing for complex facilities across hospitality, healthcare, manufacturing, and real estate. He has more than a decade of experience at firms including PwC, Marsh, Willis Towers Watson, USI, and AIG, and has evaluated properties exceeding $1 billion in value. Stephen holds a degree in Civil and Environmental Engineering from Penn State University.